Purpose

The purpose of this roadway improvement project is to increase capacity and safety improvements for vehicles, bicyclists and pedestrians through the Centerville Turnpike corridor.

Scope

The scope of services for the project includes:

  • Design of roadway and drainage improvements to widen the road to four 11-foot travel lanes, provide a raised median and curb and gutter, 4-foot bicycle lanes, 5-foot concrete sidewalk, and 8-foot asphalt sidewalk for pedestrian users.
  • Complete a Master Drainage Study of Watershed 12 (Stumpy Lake), to include existing facilities, assessment of tail-water conditions, consideration for sea-level rise, and development of proposed improvements to the watershed.
  • Incorporate results of the Master Drainage Study into the design of the stormwater conveyance system for Centerville Turnpike Phase III as well as the design of stormwater management facilities that consider both water quantity and quality.
  • Prepare all required environmental permitting documents, coordinate agency review, and secure necessary permits from appropriate regulatory agencies.
  • Complete Traffic Analysis Study of project area to support permitting and design activities including Access Management Study and signal warrant analysis.
  • Design new and upgraded traffic signals as required.
  • Design of relocated public utilities including City water and sanitary sewer facilities including connections as necessary to HRSD facilities, preparation of maintenance of service plans.

Budget

ActivityBudgetStartFinish
Design$2,357,3717/1710/23
Site Acquisition$7,390,0007/217/22
Private Utilities$1,480,0008/2210/23
Construction$27,361,90611/2310/25
Street Lights$920,00011/251/26
Landscaping$327,6872/265/26
Contingency$3,983,6967/175/26
Total$43,820,660

Primary Sidebar

Project Contact

Laurie Murphy, P.E.
Project Manager, City of Virginia Beach Department of Public Works
2473 North Landing Road, Building 23
Virginia Beach, VA 23456
lemurphy@vbgov.com
757-385-8465

Contact Us

Stay Informed

Be sure to follow along as we work to reduce congestion, increase capacity and improve safety in the Centerville area of Virginia Beach.

Learn More

Footer

Contact Information

Laurie Murphy, P.E.
Project Manager, City of Virginia Beach Department of Public Works
2473 N. Landing Road, Building 23
Virginia Beach, VA 23456
lemurphy@vbgov.com
757-385-8465

Project Information

CIP 2-419
City Project No. 100058
State Project No. U000-134-842, P101, R201, C501
Federal Project No. STP-5A03(840)

Site Content

  • About The Project
  • Existing Conditions
  • Future Design
  • Resources
  • Contact Us

Copyright © 2023  –  City of Virginia Beach